Skip to Main Content

Public View Documents

Transportation Plans

"Garden Parkway"

Gaston East-West Connector, I-85 to I-485 and NC160, Gaston and Mecklenburg Counties, Federal Aid Project number Stp-1213(6), State Project no. 8.2812501.TA.1, STIP no. U-3321 :Administrative Action Draft Environmental Impact Statement, 2 vols (R625.7 GAS). At the Reference Desk at Gastonia Main Library and at the Belmont, Bessemer City, Lowell and Union Road branches. See our locations and hours.

Reference and circulating copies of the Citizens Summary (625.7 GAS) [16 p.] are at all Gaston County branches.

Corridor Design Public Hearing Map [cartographic material] :Gaston East-West Connector, STIP no. U-3321, Gaston and Mecklenburg Counties, April 24, 2009. This map is at the Reference Desk at Gastonia Main Library and at the Belmont, Bessemer City, Lowell and Union Road branches.

Also see the Final Environmental Impact Statement, below in Cataloged Documents, R625.7 GAS 2010.

Also see the N. C. DOT website: https://www.ncdot.gov/projects/, and search for "Gaston Garden Parkway."

Renewable Fuel Facility Material Separation Plan, ReVenture Park

Renewable Fuel Facility Material Separation Plan, ReVenture Park aka Martin-Marietta, Sodyeco Superfund site. This preliminary plan is available at www.ReVenturePark.com. The proposed facility will be on the Catawba River across from Mount Holly.

For EPA documents on this Superfund site, formerly Sodyeco Inc., see below under Cataloged Materials.

©Copyright 2021, Gaston County Public Library. All Rights Reserved.